TANNAIROBOTICS

Hardware

Four published products, ready to quote.

CompareBuyer guidesAll hardware

Robot Concepts

Eight robot concepts in 360°, configured per project.

Enter the showroom

Selection & Sourcing

Not sure which part fits, how to confirm it, or where to buy it? Choose a path. Product quotes stay free.

Find my pathSee sample workAbout TANNAI

Selection & Sourcing

Choose with Confidence

Robot vision, LiDAR and edge-AI selection and sourcing, grounded in your project's real requirements.

  1. Know the model you need?Free Product QuoteFree
  2. Unsure it fits your robot?Technical Fit ReviewUS$199
  3. Need a supplier you can trust?Sourcing SprintUS$590

Apply first — payment only after we confirm the scope with you in writing.

Concept rendering: Concept rendering · the four published modules on an engineering bench
Concept rendering · the four published modules on an engineering bench

Find Your Path

Three quick answers. The recommendation follows simple, visible rules — it is not a compatibility test.

1What are you trying to build?
2What is still uncertain?
3Where is the project now?

Three Levels of Help

Each path produces something different. Compare what you pay, what you receive and what happens next.

Fee
Free
You receive
A quote reply for your models, quantity and region — or the questions we still need answered.
What happens next
Send the project brief. We reply by email; nothing is charged.
Not included
An independent, documented compatibility analysis.

Fee
US$199per scoped projectProposed pilot price
You receive
Decision summary, sourced comparison of up to three candidates, interface and risk map, pre-purchase checklist and one clarification round.
What happens next
We confirm the scope in writing; payment details follow only after you accept it.
Not included
Hardware, physical testing, software work, certification or a compatibility guarantee.

Fee
US$590per scoped projectProposed pilot price
You receive
Candidate supply paths, evidence ledger, specification and terms matrix, risk table and action plan.
What happens next
We confirm the scope in writing; payment details follow only after you accept it.
Not included
Contacting suppliers without your approval, promising prices, lead times or stock, placing orders or payments.

After the Review · Procurement Coordination After a review, supplier communication, order milestones and logistics can be coordinated under a separate written agreement, quoted case by case. Nothing is charged automatically. Ask about coordination

See the Work

Two documents you can read, enlarge and download. Both are samples built from public sources, not customer cases.

TANNAI / PRECISION ROBOTICS SOURCING

Technical Fit Review

SAMPLE 01 / INDOOR MOBILE ROBOT / 2D LiDAR

An evidence-led way to shortlist components before you place an order.

DEMONSTRATION REPORT — NOT AN ACTUAL CLIENT ENGAGEMENT. The buyer brief below is hypothetical. All product data are taken from publicly accessible manufacturer / product documentation checked on 28 Oct 2026. There was no physical testing, supplier outreach or purchase.

Executive decision brief

The decision. An educational lab is considering one 360-degree 2D LiDAR for an indoor Raspberry Pi-class mobile robot. ROS 2 integration is desired but the distribution and operating system have not been specified.

Conditional finding. RPLIDAR C1 deserves initial examination if dark-object ranges and 8–12 Hz nominal rotation are important. RPLIDAR A1 documents a slower typical 5.5 Hz speed and larger dimensions. The Waveshare D500 developer kit has a documented bundle and a compact scan-head specification. None can be chosen without clarifying OS / ROS, target reflectivity, mechanical envelope and exact kit contents.

What is still missing
  • Exact OS + ROS 2 distribution and driver version
  • Obstacle reflectivity, minimum useful range and desired scan rate
  • Mounting clearance, cable path, 5 V budget and serial interface
  • Budget, quantity, delivery country and target purchase date
  • Measurable acceptance test for the navigation application

Buyer outcome: a clear shortlist hypothesis, traceable published numbers, open risks and a concrete verification plan — not an unearned compatibility guarantee.

TANNAI ROBOTICS / TECHNICAL FIT REVIEW / SAMPLE 01RESEARCH SAMPLE · 1 / 4
Open the sample PDFPDF · 4 pages · English · Sample documents are in English.

What each service produces

Interface matrixPublished interface data for the four TANNAI modules — the kind of matrix a fit review builds for your candidates.
Product modelUSB 2.0Serial (UART)EthernetHDMIROS / ROS 2
TR-EDGE-3588Not listedNot listedPublishedPublishedNot published — ask
TR-LID-D500Via included adapterPublishedNot listedNot listedNot published — ask
TR-CAM-U4MPublishedNot listedNot listedNot listedNot published — ask
TR-CAM-S4MPublishedNot listedNot listedNot listedNot published — ask
  • TR-EDGE-3588
    • USB 2.0Not listed
    • Serial (UART)Not listed
    • EthernetPublished
    • HDMIPublished
    • ROS / ROS 2Not published — ask
  • TR-LID-D500
    • USB 2.0Via included adapter
    • Serial (UART)Published
    • EthernetNot listed
    • HDMINot listed
    • ROS / ROS 2Not published — ask
  • TR-CAM-U4M
    • USB 2.0Published
    • Serial (UART)Not listed
    • EthernetNot listed
    • HDMINot listed
    • ROS / ROS 2Not published — ask
  • TR-CAM-S4M
    • USB 2.0Published
    • Serial (UART)Not listed
    • EthernetNot listed
    • HDMINot listed
    • ROS / ROS 2Not published — ask

A published interface is not a compatibility guarantee: drivers, power and cable length are confirmed on your host.

Interface mapHow each module connects to a host, drawn from the published interfaces. Drivers and ROS versions stay questions until confirmed.
Supplier evidence cardsFrom a sourcing sprint: each path, its role and its evidence. Every term without written confirmation stays marked.
Sourcing path ASLAMTEC (manufacturer)
Role (verified)
Manufacturer
Source
S1 public spec page
Variant evidence
RPLIDAR C1; range conditional on reflectivity; TTL UART
Identity / document check
Identity from official site; regional distribution not checked

8 / 9 terms need supplier confirmation

Sourcing path BWaveshare (retail kit)
Role (verified)
Retailer / kit supplier
Source
S3 · S4
Variant evidence
D500 LiDAR Kit listing with kit contents
Identity / document check
Reseller rights and kit revision not established

8 / 9 terms need supplier confirmation

Sourcing path CSLAMTEC (alternative product)
Role (verified)
Manufacturer
Source
S2 public spec page
Variant evidence
RPLIDAR A1; 5.5 Hz; 0.15–12 m; UART 3.3 V
Identity / document check
Only if the buyer accepts a lower scan rate

8 / 9 terms need supplier confirmation

Decisions by Project

Three common B2B projects, the published modules to look at, and the conditions we would confirm with you first. Concept scenes, not delivered projects.

How It Works

Apply first, pay after the scope is confirmed. No step is charged automatically.

  1. 1Send your needsFree. Tell us what you are building and what is uncertain.
  2. 2Scope reviewWe check what we can deliver well and say plainly what we cannot.
  3. 3Written termsPrice, scope, timing and terms are agreed in writing before any work.
  4. 4PaymentOnly after you accept the terms, through an approved payment provider — never on this site.
  5. 5Report and clarificationA written report with sources, and one clarification round where the service includes it.

Fee rules

  • Product quotes and support for products you bought are always free.
  • Prices are in US dollars and are a proposed pilot; taxes, invoices and refund terms are confirmed in writing before any payment.
  • We do not promise turnaround times before the scope is agreed.
  • We contact suppliers only with your approval.

Sourcing FAQ

Short answers on fees, scope and what we do not promise.

All questions in the support center

Is there a minimum order quantity?

No MOQ is published. Products are ordered by quotation, where quantity and price are confirmed.

Can I start with a sample or a POC?

A sample checks one unit on the bench; a POC checks a configured system against a measurable task. Acceptance criteria and commercial terms are agreed before either begins.

Do you support OEM or ODM projects?

OEM / ODM coordination starts by defining requirements, configuration and acceptance criteria before a sample or project commitment. Scope is confirmed per project.

How do I pay?

By bank transfer (T/T) against our proforma invoice. Bank details appear only on that invoice, never on this website.

What is the lead time?

Lead time and availability are confirmed for your configuration and destination. No fixed dispatch date is implied.

Your Project Brief

Everything you chose on this site, in one place. Add the essentials here, then finish in one brief — you only fill it in once.

Service

Saved on this device only. Nothing is sent until you submit the brief.